Domclick's top bar hadn't changed in 10 years, and nobody measured the value of the design system

I took on both: redesigned the navigation seen by 18 million people and calculated how much the design system saves the company. Along the way, I removed unnecessary SMS codes from sign-up.

RoleStaff Product Designer, DS architect
Scale~18M MAU, 30+ teams
PlatformsWeb, iOS, Android
IndustryPropTech, FinTech
+15%more new customers complete sign-up, measured on home equity loans
was 2–6 mo2 wksdesign system updates reach production
was 24%70%design system coverage of mobile apps in 10 months

How I work on tasks

  1. Goals

    What the task gives the business and the user, which metrics will show success.

    Goals

    Before starting, I agree with stakeholders on the goal and success metric: what counts as a result and when we check.

  2. Research

    Data, interviews, CJM, competitors. Where money and customers are lost.

    Research

    I look at analytics and funnels, run interviews, build a CJM, analyze competitors. I find the step where people drop off.

  3. Solution

    Flows, prototypes, options. I cut what's unnecessary before development.

    Solution

    I build flows and prototypes in several options and check them against development and design system constraints. Each comes with a hypothesis: what will change and by how much.

  4. Validation

    Hallway and qualitative tests, a pilot on part of the audience.

    Validation

    I validate the solution with hallway and qualitative tests and run an A/B test or a pilot on part of the audience. Only validated work goes to development.

  5. Launch

    Handoff to development, implementation control, design review.

    Launch

    I prepare mockups for handoff, run tech grooming, follow the implementation and accept the result at design review.

  6. Measurement

    Metrics before and after. I lock in what works and keep developing it.

    Measurement

    I compare metrics at 2 weeks, a month and a quarter. I lock in and develop what works.

Top bar and navigation

Every team idea ran into legacy

Product teams kept coming to us in the core team: add an item, try a new entry point, run an experiment. And every time it ran into legacy.

Nobody had up-to-date mockups

Nobody had current top bar mockups in Figma: each team brought its own version, and we could neither check it quickly nor hand it to development without risk.

I shipped the update to production step by step

The top bar had barely changed for years: it was last slightly reworked three years before I joined. After that, three attempts to update it got stuck for different reasons. I managed to ship the update by breaking it down: carefully, step by step, no revolution.

Why the old top bar had to go

Users got lost in the menu

On web, mobile web, iOS and Android the menu followed different logic: items and their order differed. People who used both the site and the app had to look for the right section all over again.

The top bar wasted space

Two tiers: city, services and sign-in on top, logo and seven menu items below, each with its own dropdown. Analytics showed several items were dead: they got minimal traffic.

The business couldn't test anything

Teams came with new entry points and experiments, but the top bar couldn't even be A/B tested. Any change was expensive, so many ideas never made it to testing. Each team brought its own mockup, with nothing to compare it against.

Developers were afraid to touch it

10 years of legacy: any change could accidentally break something that worked, and the top bar really did break after changes. So changes were postponed and tech debt piled up.

Three attempts to update the top bar got stuck before me

Past concepts were bold but too far from production. They looked like a different product, and the projects stalled with stakeholders and development.

A product used by millions only changes step by step, and every step has to ship. I unified the navigation logic for web, mobile web, iOS and Android and broke the update into steps:

  1. Removed extra elements and made the sign-in button more prominent

  2. Moved the menu into a burger labeled “Menu”

  3. Tested the burger without the label and measured the difference

  4. Rearranged the top bar elements

  5. Updated the cards on the home page

Some mobile app features belonged to other teams, so I synced the steps with them in a shared yearly plan for the design system and the home page.

Yearly plan for the Domclick design system and home page, blurred under NDA

Before and after

Before

Two tiers. City, services and sign-in on top, logo and seven menu items below, each with its own dropdown.

After

One tier. Logo, city and a “Menu” button that opens all sections in one panel.

Old Domclick top bar: two tiers
New top bar: one tier and a “Menu” button

How I sold it to the business

Fighting legacy

Nobody funds technical hygiene: why does the business need it, and won't we break the metrics?

Showed the pain

User complaints, tech debt and a top bar that couldn't be A/B tested

Removed the risks

A/B test on 5% of the audience, guardrail metrics for each product and a rollback option

Showed the value

One navigation that can be maintained, measured and evolved

Objections and how I answered them

The concerns repeated, so I prepared answers in advance, before the general presentation.

Show all objections and answers

Colleague from a product team

What are you doing? This will break everything!

Interim versions of the top bar spread around the company too early, and messages like this kept coming. I went to people in person, showed the plan and explained there would be no abrupt changes. Since then I talk changes through before anyone sees them.

ObjectionMy answer
Users: “I'm used to where things are, now I won't find them.”
We updated step by step; key entry points stayed in place.
Users: “It takes more clicks to reach the section I need.”
The most frequent scenarios moved to the first level. We checked against data which paths people actually take.
Users: “The menu differs in the app and on the site, I get confused.”
We made one navigation pattern for web and the app.
Business: “Traffic to our product will drop if it loses its place in the top bar.”
A/B test, guardrail metrics for every product and the option to roll back.
Business: “Every cluster wants its own button in the top bar.”
Shared data-driven priority rules: the place in the top bar goes to what matters more to users.
Business: “Why touch something that has worked for 10 years?”
Showed user complaints, accumulated tech debt, and the fact that the top bar couldn't even be A/B tested.
Business: “It's expensive, rewriting legacy takes long.”
In stages, on ready-made design system components, with effort estimates.
Business: “We'll break SEO and analytics.”
We kept page URLs and event tracking.
Business: “We have partner placements in the top bar.”
We kept a partner slot for developers.

Hypothesis and measurement

Goal
Make the top bar manageable: launch entry points and test ideas in it without losing product traffic
Primary metric
Clicks from the top bar to products and site sections
Must not drop
Traffic to each product, menu clicks, SEO and event tracking
Hypothesis
If the menu is gathered in one panel behind a “Menu” button, people will find the section they need no worse than before, and the top bar becomes simpler, because frequent scenarios stay on the first level
How we tested
A/B tests of several versions on 5% of the audience, with the rest as a control group. Each test ran for full weeks, 2 to 4 weeks or longer. After the rollout, part of the audience stayed on the old version (holdout), and we checked the outcome once the novelty effect wore off
Result
The unlabeled burger version noticeably reduced clicks, so we dropped it. With the “Menu” button, clicks and guardrail metrics held, and this version was rolled out. A green “Log in” button instead of grey text, tested as a separate A/B group: +17% sign-ups from the top bar per month
+17%sign-ups from the top bar per month after the green “Log in” button
First time in 10 yearsDomclick's top bar changed in production, and it can finally be A/B tested.
Target concept of the Domclick top bar: where the next steps lead

Side improvements

Sign-up without extra SMS: +15% new customers

While working on navigation, I noticed another place where customers were lost: every consent during sign-up was confirmed with a separate SMS. I brought the hypothesis to the analysts and product managers, and the data confirmed it: 45% of new customers dropped off at the consent step.

Sber ID integration was underway, which opened a window to rebuild authorization as well. Together with the team we moved sign-in to Sber ID and the unified account: when signing in with Sber ID, consents no longer need separate SMS confirmations.

Hypothesis and measurement

Goal
More new customers reach a loan application
Primary metric
Share of attempts that pass the consent step
Hypothesis
If signing in with Sber ID no longer requires a separate SMS for each consent, drop-off at this step will fall, because the person has already verified their identity with Sber
How we tested
Rollout to part of the audience with a control group and a holdout; the sign-up funnel was compared over 2–4 full weeks before and after
Result
90% of attempts pass the consent step instead of 65% (all customers). 15% more new customers complete sign-up: unique customers, measured on home equity loans
90%of attempts pass the consent stepwas 65%
+15%more new customers complete sign-up, measured on home equity loans

A top bar banner launches in 1 day instead of 3–4

Marketing launched promotions abruptly: we learned about a campaign 1–3 days before start and urgently reshuffled tasks. There was a risk of missing the launch, and each banner took a lot of my colleagues' time.

First, I agreed with marketing that we learn about banner and promo plans in advance whenever possible. Then, together with marketing, communication design and development, we prepared a banner template, guidelines and component, built it and made an admin panel. Banners now upload and change quickly, responsive layouts and edge cases are covered in advance, and one day is enough to launch.

That's it for the top bar, thank you!

Design system

Nobody could show the value of the design system in numbers

40+ designers and 180+ developers work with it. Versions in Figma and code drifted apart, updates took months to reach production, and nobody could say how much the DS saves the company.

Mobile apps lagged behind desktop

Design system coverage in the mobile apps was only 24%: new features used the fresh DS, while old screens stayed on outdated components.

I drew up a 2-year strategy and started with metrics

Without metrics, no next step can be sold. My goal was for the design system to talk to the business in the language of money.

2-year design system strategy tracks with goals and quarterly plans, blurred under NDA

Real-time metrics

Together with developers, I automated metrics collection: coverage is calculated from the Web, iOS and Android code and displayed with history in Grafana.

What it gave us and which metrics we track

  • The coverage scanner got a “Screens by quarter” section per team: you can see where tech debt accumulates
  • The audit of Figma vs iOS and Android code was finished 26 days ahead of plan
  • Pulled tasks for 2023–2025 via the Jira API and for the first time saw how long the path from design to release takes
Adoption RateCoverage RateTest CoverageComponent FreshnessDev Time SavedTime to MarketTime on TaskMedian Time to UI ChangeUpdate LagDS SatisfactionAccessibility Coverage

Design system value on company data

Design system value is usually backed by foreign studies: “speeds up work by 30–40%”. I needed a calculation based on Domclick data.

Team hourstime spent building and reusing components
Component costone expensive DS component vs three stripped-down copies in teams
Pessimismminimal coefficient, only some of the developers
Budget defendedvalue calculated on Domclick data

Designer and product manager time wasn't counted, so the real effect is higher.

It didn't work the first time

The first automated metrics were wrong: if I had just handed the task to developers without checking, we would have got pretty but meaningless numbers. We had to split them into top-level and detailed ones. The first value formula was also superficial, and only the second iteration passed sanity checks.

How I brought the mobile teams along

Old screens spoiled the statistics, and for teams migration was extra work on top of business priorities. Using the metrics, I found outdated screens and grouped teams by coverage.

Good coveragerecognized publicly
Mediumstarted with them: screen list, plan and help with migration
Poorcaught up last, once the business started asking them questions
70%mobile app coverage, target 90%+was 24%
67.5%visual similarity with Sber's DSwas 59.5%

How I negotiated with the teams

I agreed with each team in person, together with its developers. Coverage started growing quarter over quarter, whereas before it had stalled or dropped.

Rules, versions and automation

A simple rule for when a team builds its own component

A complex select is urgently needed, a developer builds their own, and then it turns out it isn't aligned with the DS. To prevent this, I introduced a rule:

One teamthe component is product-specific, we don't add it to the DS
Two teamsone of them maintains it
More than twothe component becomes part of the design system

I described the rule in guides and checklists, explained it in posts and collected feedback from designers.

One component version in Figma and in code

I linked versions in Figma and code with the Component Version plugin: I specified how it should work, and we built it together with the team. The version goes up only when a change creates a development task, and teams learn about discrepancies from notifications in the work chat.

Slide: Component Version plugin
Slide: syncing Figma and code versions

Scripts and a bot took over routine: from 5 to 1–2 SP per sprint

I automated handing illustrations over to the design system with LLMs: names, the component card and development tasks are created automatically. Component usage stats from Figma are pulled by the UDS Scanner Telegram bot, even though such stats are only available on the Enterprise plan and we were on Professional. The bot was my idea; we built it together with the team.

<1 minto find where a specific image is usedwas 30–90 min
1 dayto audit the whole graphics librarywas dozens of hours

Over time

2 wksfor updates to reach productionwas 2–6 mo
4.4designers' trust in the DS, out of 5was 3.2
1–2 moto fix DS bugswas 4–6

What else changed in the design system

The design system showcase was opened to ~619 employees. Regular visitors over three months grew from 246 to 401: people started using the showcase more often, browsing it and checking against it.

Once a month I run on-site design reviews with product designers and publish the “DS team showreel” digest for the design director and the “Domclick Design” Telegram channel.

Digest cover “This month in the unified design system”
  • WCAG AA: keyboard navigation, contrast, alt text, accessible forms, tests with blind testers
  • Light and dark themes, animations for 22 components, haptics, unified iOS / Android / PWA patterns
  • New iOS components: Accordion, Date Picker, Uploader; one animation mechanism for icons and illustrations
  • Documentation for 50+ components, our own Storybook-based showcase with a sandbox
  • Four different full-screen galleries in the mobile apps merged into one component with built-in analytics
  • 80+ illustrations and 30+ icons; new graphics reach the DS in 1–2 weeks

The design system now proves its value with numbers, works more efficiently and responds faster to its users' requests.

What I took away from both stories

  • A big product only changes gradually: a bold concept without a path from current production never reaches development
  • Changes should be talked through before people see them, and objections handled with each stakeholder separately
  • Metrics are needed from day one, and they must be checked by hand: unchecked automation produces pretty but meaningless numbers

Write to me to discuss a job or a project